GEOMETRISI
EXECUTED GEOTECHNICAL INVESTIGATION AND DESIGN
| PROJECT | START | END | WORKS EXECUTED |
| ERIMIA Wind Farm | 2023 | Geotechnical Investigation and Design, Laboratory Testing, In situ Laboratory Testing, Geophysical investigation | |
| Geotechnical Survey and Study for landslides along the A2 road (Fodele – Crete) | 2023 | 2023 | Geotechnical Investigation and Design, Laboratory Testing, In situ Laboratory Testing |
| Geotechnical Survey and Study for the retaining walls along the A2 road (Fodele – Crete) | 2023 | 2023 | Geotechnical Investigation and Design, Laboratory Testing, In situ Laboratory Testing |
| ANEMOS MANIS Wind Park |
2022 | 2023 | Geotechnical Investigation and Design, Laboratory Testing, In situ Laboratory Testing, Geophysical investigation |
| Tsamadorahi Wind Park | 2022 | 2022 | Geotechnical Investigation and Design, Laboratory Testing, In situ Laboratory Testing |
| School complex of Kontakaiika, island of Samos | 2021 | 2021 | Geotechnical Investigation and Design, Laboratory Testing, In situ Laboratory Testing |
| School complex of Platanos, island of Samos | 2021 | 2021 | Geotechnical Investigation and Design, Laboratory Testing, In situ Laboratory Testing |
| ADMHE Foundation of a pillar in Aspropyrgos | 2021 | 2021 | Geotechnical Investigation and Design, Laboratory Testing |
| Profitis Ilias Wind Park | 2021 | 2021 | Geotechnical Investigation and Design, Laboratory Testing, In situ Laboratory Testing |
| Makrilakkoma Wind Park | 2021 | 2021 | Geotechnical Investigation and Design, Laboratory Testing, In situ Laboratory Testing |
| Lixouri Public Library (Iakovateios Library) | 2021 | 2021 | Geotechnical Investigation and Design, Laboratory Testing |
| Biogas Avlidos | 2021 | 2021 | Geotechnical Investigation and Design, Laboratory Testing |
| Sitia Wind Park | 2021 | 2021 | Geotechnical Investigation and Design, Laboratory Testing, In situ Laboratory Testing |
| Geotechnical Investigation – Design at new WWTP unit, Helpe Aspropyrgos | 2021 | 2021 | Geotechnical Investigation, Design, Laboratory Testing |
| Construction of a 3-star hotel, Mytika, Etoloakarnania |
2021 | 2021 | Geotechnical Investigation and Design, Laboratory Testing |
| Geotechnical research – Foundation design at Oropos coast road | 2020 | 2020 | Geotechnical Investigation and Design, Laboratory Testing |
| Geotechnical research – Foundation design at Skaramagas, Attika | 2020 | 2020 | Geotechnical Investigation and Design, Laboratory Testing |
| Geotechnical research – Foundation design at Halkoutsi | 2020 | 2020 | Geotechnical Investigation and Design, Laboratory Testing |
| Geotechnical research – Foundation design at Oropos | 2020 | 2020 | Geotechnical Investigation and Design, Laboratory Testing |
| Geotechnical research – Foundation design for Fishing Shelter on the Island of Amorgos | 2020 | 2020 | Geotechnical Investigation and Design, Laboratory Testing |
| Geotechnical research – design for the foundation of pylons of the 400kV transmission line, Megalopoli-Corinth | 2020 | 2020 | Geotechnical Investigation and Design, Laboratory Testing |
| Geotechnical research – design at the factory of Papoutsani SA in Ritsona, Evia | 2020 | 2020 | Geotechnical Investigation and Design, Laboratory Testing |
| Geotechnical research – design on a privately owned plot in Vasiliko, EVIA | 2020 | 2020 | Geotechnical Investigation and Design, Laboratory Testing |
| “NEW TOURIST UNIT 5 STARS ON THE ISLAND OF KIMOLOS” | 2020 | 2020 | Geotechnical Investigation and Design, Laboratory Testing, Geophysical investigation |
| Geotechnical investigation – design for the foundation of a new house on Paros island, PRIAMERIA LIMITED | 2020 | 2020 | Geotechnical Investigation and Design, Laboratory Testing |
| PERSEUS Factory, Leheo, Corinthos | 2020 | 2020 | Geotechnical Investigation and Design, Laboratory Testing, Geophysical investigation |
| Wind Park ZARAKES Ν.Steira, Evia | 2019 | – | Geotechnical Investigation, Design, Laboratory Testing |
| Geotechnical Investigation – Design of Building Complex on 14, Sarantaporou Str, Patisia | 2019 | – | Geotechnical Investigation, Design, Laboratory Testing |
| Geotechnical Investigation – Design of Landslides at L.C. of Arkadia Prefecture (Lagkadia – Agios Petros – Vourvoura) | 2019 | – | Geotechnical Investigation, Design, Laboratory Testing |
| Geotechnical Investigation of Landslides σε at L.C. of Sparta Municipality (Voutiani) | 2019 | – | Geotechnical Investigation, Laboratory Testing |
| Geotechnical Investigation – Design at new Substation Ss R-7700 Helped Aspropyrgos | 2019 | 2019 | Geotechnical Investigation, Design, Laboratory Testing |
| Geotechnical Investigation – Design of Landslides at L.C. of Megalopoli Municipality (Spaneika – Falesia – Rapsomati) | 2019 | 2019 | Geotechnical Investigation, Design, Laboratory Testing |
| Geotechnical Investigation for the project “Divert of Ag. Aikaterini stream and canalisation of Soures stream of Thriasio Pedio” | 2019 | 2019 | Geotechnical Investigation, Design, Laboratory Testing |
| Wind Park Arkadiaka Meltemia and Arkadia Wind Parks | 2019 | 2019 | In situ testing |
| Kedros Wind Park | 2019 | 2019 | In situ testing |
| Geological – Geophysical Investigation – Design of Manis Wind Parks | 2018 | 2018 | Geological, Geophysical Investigation and Design |
| Geotechnical Investigation – Design Bioethers Conversion Project HELPE Aspropyrgos | 2018 | 2018 | Geotechnical Investigation, Design, Laboratory Testing |
| Geotechnical Investigation – Design Fcc Flue Gas Station 2020T/A HELPE Aspropyrgos | 2018 | 2018 | Geotechnical Investigation, Design, Laboratory Testing |
| Geotechnical Investigation – Design od Spilia & Platanos Wind Parks | 2018 | 2018 | Geotechnical Investigation, Design, Laboratory Testing |
| Soil and Asphalt In Situ Testing Connection of Pallinis KYT – Kafireas Project | 2018 | 2018 | Factual Report, Laboratory Testing |
| Kafireas Project | 2018 | 2019 | Geological, Geophysical Investigation and Design, In situ testing |
| Geotechnical Investigation – Design at Bridge Location at Mandra, Attiki | 2018 | 2018 | Geotechnical Investigation, Design, Laboratory Testing |
| Geological investigation of Landslide Prone Slopes at Kathata, Kafireas Wind Parks | 2018 | 2018 | Geological Study |
| Restoration Design for the Development and Functional Reintegration of Chalkida Municipal Market. | 2018 | 2018 | Laboratory Soil and Rock Testing |
| Geotechnical Investigation for the new bridge at Agios Sotiras | 2018 | 2018 | Laboratory Soil and Rock Testing |
| Geotechnical Investigation – Design of MetalTanks at Kilkis | 2017 | 2017 | Geotechnical Investigation, Design, Laboratory Testing |
| Geotechnical Investigation – Design for the Foundation of Pumping House for the Project: Wastewater Treatment & Disposal Plant of Ag. Pelagia, Municipality of Malevizi | 2017 | 2017 | Geotechnical Investigation, Design, Laboratory Testing |
| Geotechnical Investigation – Design Addition of Three Floors at Existing Basement Building | 2017 | 2017 | Geotechnical Investigation, Design, Laboratory Testing |
| Geotechnical Investigation – Design Foundation of Υ/Σ Megalo Vouno | 2017 | 2017 | Geotechnical Investigation, Design, Laboratory Testing |
| Geotechical Design for the Wastewater Treatment Plant of Megalopolis Municipality | 2017 | 2017 | Geotechnical Investigation, Design, Laboratory Testing |
| Geotechnical Investigation – Design for the Hotel Erection at L.C. Karoti – Δ.Ε. Lapaion, Rethimno Manicipality, “Madaro” Location | 2016 | 2016 | Geotechnical Investigation, Design, Laboratory Testing |
| Geotechnical Investigation – Design for “Megalo Vouno: Wind Park Almyropotamos, Evia | 2016 | 2016 | Geotechnical Investigation, Design, Laboratory Testing |
| Geotechnical Investigation – Design for the Foundation of Tanks at La Farm Facilities, Trikala. | 2016 | 2016 | Geotechnical Investigation, Design, Laboratory Testing |
| Sampling Offshore Drilling at Perama Shipyard | 2016 | 2016 | Geotechnical Investigation, Laboratory Testing |
| Geotechnical Investigation and Design of Regional Anafi Clinic | 2016 | 2016 | Geotechnical Investigation, Design, Laboratory Testing |
| Sampling Offshore Drilling at Vrachati Fishing Reserve | 2016 | 2016 | Geotechnical Investigation, Laboratory Testing |
| Geotechnical Investigation at Spartinon Marine Area Alonisos Island | 2015 | 2015 | Geotechnical Investigation, Laboratory Testing |
| Urgent Geotechnical Designs for Landslides Restorations and Embankment Design at Road Subsection “Koynavon Interchange – Arkaloxori Interchange” of road axis Iraklio – Viannos. | 2015 | 2015 | Geotechnical Investigation, Laboratory Testing |
| Geotechnical Technical Report of Foundation Soil at 2nd Primary School, Chora Naxos. | 2014 | 2014 | Geotechnical Investigation, Laboratory Testing |
| Geotechnical Investigation – Design Completion of Sewerage Pipeline Network (Gialova Pumping Stations) | 2014 | 2014 | Geotechnical Investigation, Laboratory Testing |
| Geotechnical Design at Psachna and Kastela Areas of Dirfi – Messapion Municipality at Evia Prefecture for the project Design of works for Sewage Collection, Transmission – Treatment and Disposal. | 2014 | 2014 | Geotechnical Investigation, Laboratory Testing |
| Geological and Geotechnical Report for buildings and facilities foundation and slope stability analysis of Substation (Υ/Σ) 20/150 KV, for the interconnection of “Perganti” Wind Park with Δ.Ε. Medeonos, Aktio-Vonitsa municipality, Aitoloakarnania Prefecture | 2014 | 2014 | Geotechnical Investigation, Laboratory Testing |
| Sewage Sewerage Network and Wastewater Treatment Plant of Tychero, Municipality of Soufli | 2014 | 2014 | Geotechnical Investigation, Laboratory Testing |
| EcoDevelopment Park of Kaiafas Thermal Springs | 2013 | 2014 | Geotechnical Investigation, Design, Laboratory Testing |
| Geotechnical Investigation and Design for the project: “Construction of Sewage Sewerage Network and Wastewater Treatment Plant of Arkalochori” | 2013 | 2014 | Geotechnical Investigation, Laboratory Testing |
| Diversion of Alamaneika | 2013 | 2014 | Geotechnical Investigation, Design, Laboratory Testing |
| Geotechnical Investigation of Sidero Stream Dam, Soufli, Evros | 2013 | Geotechnical Investigation, Laboratory Testing | |
| Geotechnical Design for the Reconstruction of the Kato Klitoria District Road Bridge | 2013 | 2013 | Geotechnical Investigation, Design, Laboratory Testing |
| Geotechnical Investigation – Design for the restoration of Kalamos & Kastro Landfill sites, Lefkada Municipality | 2012 | 2012 | Geotechnical Design |
| Geotechnical Design for Agia Efthimia Drainage Network, Kefallinia Municipality | 2012 | 2012 | Geotechnical Design |
| Slope Landslide at Kremasti Monastery, Ilia | 2012 | 2012 | Geotechnical Investigation, Laboratory Testing |
| Municipality | |||
| Geotechnical Design Extension of Lefkada Wastewater Treatment Plant | 2012 | 2012 | Geotechnical Design, Laboratory Testing |
| Geotechnical Design of Lixouri drains. Kefalonia Municipality | 2012 | 2012 | Geotechnical Design, Laboratory Testing |
| Geotechnical Design of Chiliadou Retaining Structure, Evia Prefecture | 2012 | 2012 | Geotechnical Investigation, Laboratory Testing |
| Geotechnical Design of Kalavrita Photovoltaic Park, Achaia Prefecture. | 2012 | 2012 | Geotechnical Design, Laboratory Testing |
| Geotechnical Design of Megara Photovoltaic Park, Megara, Attica. | 2012 | 2012 | Geotechnical Investigation, Laboratory Testing |
| Geotechnical Design Φ/Β Πάρκου Ληγουριό Ν. Αργολίδας | 2012 | 2012 | Geotechnical Investigation, Laboratory Testing |
| Geotechnical Design SERKA S.A. Photovoltaic Park, Aspropyrgos | 2012 | 2012 | Geotechnical Investigation, Laboratory Testing |
| Geotechnical Design of Chrisaugi Photovoltaic Park, Trikala Prefecture | 2012 | 2012 | Geotechnical Design |
| Geotechnical Design Meligala Photovoltaic Park, Messinia Prefecture | 2012 | 2012 | Geotechnical Design |
| Geotechnical Design of 500 Kw Photovoltaic Park, Gorista Location, Aspropyrgos | 2012 | 2012 | Geotechnical Investigation, Laboratory Testing |
| Construction of Wind Park at Aliveri, Evia Prefecture. | 2012 | 2012 | Geotechnical Investigation, Design, Laboratory Testing |
| Geotechnical Investigation – Design of building at Poros Location, Skiathos Island | 2011 | 2011 | Geotechnical Investigation, Design, Laboratory Testing |
| Geotechnical Design of Photovoltaic Park at Charamos Location, Argolida Prefecture | 2011 | 2011 | Geotechnical Investigation, Design, Laboratory Testing |
| Construction of Kouloukona Wind Park, Rethimno Prefecture | 2011 | 2011 | Geotechnical Investigation, Design, Laboratory Testing |







Ελληνικά